The release ledger used for the second version begins on 8 July 2026 with an entry numbered 0.1.0. It describes itself as the first tracked release. That means the beginning of this particular release record: the retained April prototype already carried a version number, and older documents used a different numbering sequence.

The July entry established a place to connect versions with changes and deployment records. It deliberately did not reconstruct a release-by-release account of everything that came before. That boundary is useful. A historical account should be able to say where a reliable sequence begins without filling the earlier period with plausible entries.

A concrete hardening problem

An August correction shows why the sequence needs more than version labels. Several background parts of the application could read the same matter, change different information and save their results. A later save could carry an older copy of information another part had just updated.

One visible consequence described in the correction was a preparation pack continuing to appear current after an event should have marked it out of date. Another involved completed research failing to remain represented in the stored matter. These were persistence problems: what the application had just learned could be lost when another task finished.

The correction committed on 29 August changed the affected partial updates so that they read the current matter and made their change within the same protected operation. It retained separate behaviour for operations intended to replace a whole record, such as restoration.

The accompanying regression work checked the stored result, including deliberately overlapping updates. That is a stronger test of this defect than checking only that a save function had been called. The record also explains how testing changed the original diagnosis and exposed additional writers that needed correction.

What reached the service

The release containing this change, 0.1.38, is dated 29 August. Its deployment record reports a successful first deployment that day, with an identified build and subsequent checks. A later application deployment of the same release is recorded on 1 September. The market-site record was updated again on 2 September.

These are separate events. The September application receipt is not the first recorded deployment of 0.1.38. A website publication does not itself establish which application build was served. A release entry, meanwhile, describes a version without proving that every installation has received it.

The retained deployment account identifies the build and records checks against the served artefact. This retrospective reports that historical evidence; it is not a fresh check of the service running today.

What the record does not measure

The correction and its regression evidence do not measure how much work a particular firm saved, or prove that a solicitor encountered and avoided the earlier defect on a live matter. No such customer outcome is claimed.

The practical lesson is to ask which version contains a change, what tested it and what evidence connects it to the environment being evaluated. For preparation work, the preparation-pack guide explains the separate questions of source coverage and currency. The solicitor must still review the resulting material before using it.

Check current product status and limits.

On this topic in other markets